Ed Sylvis Construction Logo Click Here to Return Job Site Photographs Index Page

Correcting a Sagging Floor #2

The only crawl access was more than 100 feet away from the sagging floor section. There was no cross ventilation. When I reached this area the air was damp and heavy. Fungus was growing on the rotted glu-lam girders and floor joists. Pier posts had rotted in their metal brackets.

Next Photo

[_private/navbar.htm]